Back to all Project Profiles

Fraser River Pile & Dredge Ltd.’s No.5 Road Facility Upgrade – Fraser River

Location
City of Richmond — British Columbia
Client
Fraser River Pile & Dredge Ltd.
Service Sectors
Design & Construction, Monitoring & Assessment, Permitting
Services
Compensation Habitat Design, Contract Administration, DFO Authorization, Environmental Assessment, Environmental Monitoring, FREMP Permitting, Intertidal Habitat Design, Technical Authority, Wetland Design

Fraser River Pile & Dredge Ltd. operates an aggregate and bulk material handling facility on the Fraser River, at No.5 Road, Richmond. Logistical operations associated with a barge ramp required expanded capability to stage materials. The expansion in the staging area required the filling of a moorage basin.

Fraser River Pile & Dredge Ltd. retained Envirowest to navigate the permitting process of the Fraser River Estuary Management Program and to obtain approvals, as required, from member agencies. In this regard, as there was a ‘harmful alteration, disruption and destruction’ of fish habitat, Envirowest obtained a Section 35(2) Fisheries Act Authorization from Fisheries and Oceans Canada for the project.

Envirowest designed compensation fish habitats that offset impacts to habitats attributable to the project. A large intertidal basin was constructed, which encapsulated channel, sandflat, marsh and riparian habitats. We managed the contract for construction and monitored construction activities to ensure adherence to design and mitigation of impacts to existing habitats and water quality. Envirowest conducted post-construction monitoring to assess the performance of habitats; as per the requirement of the Authorization, compensation habitats are ‘functioning as intended’.

Back to all Project Profiles